Training library
Getting Started· 75s·FREE
Understanding the project layout in 60 seconds
Recognise the four primary screens of any modern construction field app: home, projects, inspections, settings.
Practical steps
- 1
Note the bottom navigation. Most apps put project navigation on the left and account or settings on the right.
- 2
Open the home tab. This shows your assigned work plus anything synced overnight.
- 3
Open the projects tab. This is where you switch between live sites if you work on more than one.
- 4
Open the inspections or issues tab. This is the working area where 70 percent of your daily taps happen.
- 5
Open settings. Confirm offline mode is enabled and notifications are on for assignments.
Key takeaways
- Four screens cover 95 percent of daily use. Anything else is a feature you might never need.
- Offline mode must be enabled before you leave Wi-Fi on day one.
- Notifications for assignments matter, notifications for marketing do not.
Printable checklist
Two sides of A4, gloves-on legible, fits in a hi-vis pocket.