Pre-pour inspection that signs off in 4 minutes

Run a pre-pour inspection that captures everything the structural engineer will ask for, on the phone, in 4 minutes.

Practical steps

  1. 1

    Open the inspections tab. Tap plus then pick Pre-pour from the type list.

  2. 2

    Confirm the plot, level, and pour reference. These three fields drive the rest of the form.

  3. 3

    Photo set: rebar layout, cover spacers, top-of-formwork level, any embedded items.

  4. 4

    Tick off the standard checks: rebar tied, cover correct, formwork clean, no debris, services in place.

  5. 5

    Add the engineer's name if a sign-off is needed. The record routes to them for digital sign-off.

  6. 6

    Save and submit. Confirm the QA team and the engineer both appear in the routing list.

Key takeaways

  • Plot, level, pour. These three fields are the spine of the record.
  • Four photos at the right angles beats fifty photos of the wider scene.
  • Engineer routing is invisible if not assigned. Always check the routing list before saving.

Printable checklist

Two sides of A4, gloves-on legible, fits in a hi-vis pocket.